metal stamping parts with oem&odm service

Metal Stamping Parts With OEM&ODM Service

Quick Details


Size:Customized
Application:Industrial
Product name:Metal Stamping Parts With OEM&ODM Service
Surface treatment:Polish,chrome plated
Process:Punching/Stamping
Tolerance:0.02mm
Material:Metal
Quality:Good
OEM:Yes

 

Product Description


 Material
Steel,other aluminum,stainless steel and brass is available
Finish
              Polish&black zinc plated
Size
Customized
MOQ
If need an new mold,1000 pcs first some samples can be made by hand
 Process way
Punching/Stamping,machining
 Tolerance
0.02mm

 

Available Material
1)Metal: Stainless steel Steel(Iron,)Brass,Copper,Aluminum
2)Plastic:POM,Nylon,ABS,PP
3)OEM according to your request
Surface treatment
Anodized different color,Mini polishing&brushing,Electroplating(zinc plated,nickel plated,chrome plated),Power coating& PVD coating,Laser marking&Silk screen,Printing,Welding,Harden etc.
Process Methods
CNC machining, Punching/Stamping  Auto lathing/turning,Milling,Grindin, Tapping Drilling,Bending,Casting,Laser cutting
Drawing Format
CAD,3D(stp,igs,dfx),PDF
Certificate
ISO 9001:2015,SGS,RoHs
MOQ
For stamping and injection molding: 1000pcs ,For machining: 10 pcs,100 pcs are ok,based on drawing
Tolerance
In general:+-0.01-0.05 mm, can be more precision,according to your requirement.
Delivery time
For stamping and injection molding,25 working days ,For machining,sample can be finished in 10 days,according to the drawing.

 

FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How can I get the quotation?
A: Please send us information for quote: drawing, material, weight, quantity and request,w can accept PDF, IGS, DWG, STEP file format.
If you don’t have drawing, please send the sample to us,we can quote based on your sample too.

Q: What's your MOQ?
In general 1000 pcs,but can accept low quantity in some special conditions.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What about the leading time for mass production?
A: Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.

Q: What if the parts are not good?
A:We can guarantee good quality,but if happened,please contact us immediately, take some pictures, we will check on the problem,and solve it asap.

Q: What is your terms of payment ?
A: Payment<=1000 USD, 100% in advance. Payment>=1000 USD, 30% T/T in advance ,balance before shipment